We arrived at the house this afternoon to find work still in progress. Our contractor, Vince, was ripping the roof off the back of the house. This portion is getting re-built and extended to the back of the new concrete pad.
I took a look inside after work stopped for the night, and the most noticeable change was a new beam in the crawl space at the back of the house.
New timber supporting the floor joists where there wasn't one before.
No comments:
Post a Comment