We have spent the last five nights at a local hotel while the last bit of finishing work is completed on our house. Needless to say we are more than ready to move in.
The last of the flooring went in today with carpet on the stairs and in the downstairs bedrooms. The plumbers have been in to install fixtures, tub, sinks, and toilets. Comcast was in to hook up the cable, phone, and Internet.
Since my last post, we've also had the counter tops installed, as well as most of the lighting. Some of our light fixtures are on back order. We also had our stairs, sidewalk and back porch concrete done.
|
Back of the house with foam insulation on the slab, and drain pipe in place prior to concrete being poured. |
|
Front steps and sidewalk |
|
Side steps off the porch to driveway |
|
Decorative curb to enclose insulation on the slab. |
|
Back porch slab. |
|
Granite counter tops in place with temporary supports under the bar. |
|
The kitchen island and bar. |
|
Dining light fixture hanging above some of our stuff. |
|
Laminate flooring completed throughout the downstairs. |
|
Tile work in the master shower. |
|
Upstairs hallway: painted, carpeted and door hardware installed. |
|
Master bath vanity and lighting. |
|
Kitchen with microwave installed. |
|
Sailboats in the bay. |
AMAAAAAAZING!!! Looks fantastic! Can't waitt o see it in person!
ReplyDeleteGreat post. I was checking continuously this blog and I am impressed!Very useful information particularly the last part :) I care for such info a lot. I was seeking this certain information for a long time.
ReplyDeletenon surgical facelift
non surgical face lift
best non surgical face lift
best non surgical facelift
face lift non surgical
non surgical facelift treatment
non surgical facelift procedures
non surgical face treatments
best non surgical facial treatments
face lift treatment
vampire facelift
non surgical face lifting
facelift cosmetic surgery
facelift without surgery
non surgical chin lift